262 Marine Parade,
Swanbourne

Dear Tim,

Thank you for the opportunity to present our proposal for the project at 262 Marine Parade, Swanbourne WA 6010

This proposal prices the works as drawn and specified in the documents supplied:

  • Architectural Drawing Set

Previously$30M

Current
$25M
Total Project Value

Previously30 months

Current
24
Working Months

Previously15%

Current
10%
Cost Plus Margin (option)

3D Construction Methodology.

3D Construction Methodology, page 1 of 10
01 / 10
3D Construction Methodology 262 Marine Parade 3D construction methodology · 10 pages
Original Methodology

Opinion of Probable Cost

W.ROBERTSMeasurementRateCost Plan
01. Internal Finished Area1,664.54 m²$11,000 /m²$18,309,890.34
02. Garage & Storage Area481.06 m²$5,000 /m²$2,405,281.01
03. Driveway Area88.79 m²$1,000 /m²$88,792.71
04. External Enclosed Area628.71 m²$5,000 /m²$3,143,562.59
05. External Finished Area92.42 m²$2,000 /m²$184,839.22
06. Planter Area230.04 m²$3,000 /m²$690,127.48
07. Pool Area146.85 m²$4,000 /m²$587,382.94
08. Soft Landscaping Area1,118.34 m²$500 /m²$559,168.55
Indicative Total inc GST + Landscaping4,450.74 m²$25,969,044.83
Construction Duration

We anticipate a 24 working month construction programme (528 working days), start to finish.

Exclusions
01

All consultant fees associated with the project.

02

Bonds for trees and vegetation.

03

Authority fees such as council bonds / asset protection / tree protection etc.

04

Authority fees / service upgrades / CT metering / utility costs.

05

All connection fees (phone, gas, electrical and water).

06

Any works outside of the title boundary, including upgrading sewer, gas, power, water, or associated works (inclusive of trenching etc).

07

Working with or the removal of contaminated material or other latent in-ground conditions.

Case Studies.

W.SOUTH YARRA

South Yarra VIC

A $20M+ basement and three-storey restoration and extension to a grand heritage mansion, with an off-form concrete and stone-clad extension, including an 11-car basement. Complex sequencing included tunnelling under the existing house.

W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence W.SOUTH YARRA residence

W.HOPETOUN

Toorak VIC

A four-level, cantilevered off-form concrete residence overlooking the city, delivered ahead of program.

W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence W.HOPETOUN residence

W.MERMAID

Mermaid Waters QLD

A north-facing waterfront home on the Gold Coast, completed two months ahead of schedule with a subcontractor base assembled from scratch in another state. New market; the result did not change.

W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence W.MERMAID residence

The Technology Stack.

W.App

Everything on a W. project runs through W.App: workflows and approvals, documents, live site cameras, the 3D model, project intelligence and every conversation with your W. team, in your pocket, every day.

W.App: home screen, workflows and project discussions
W.App: 262 Marine Parade project intelligence
Live site cameras: multiple views of construction progress

W.OS (Operating System)

Let It

Let It is our procurement marketplace, where every trade package on your project is tendered to our national network of vetted subcontractors and suppliers and compared side by side. The result is competitive, market-tested pricing on every package and procurement completed in weeks rather than months, protecting your budget and your program.

Solve It

Solve It is our design resolution module, where your drawings are coordinated, clashes and gaps are identified, and design decisions are resolved before they become issues on site. The result is fewer costly variations, fewer delays and a fully resolved design that still honours the original design intent.

Pay It

Pay It is our payment platform, the single source of truth for every progress payment to every trade on your project. Every claim is verified against site photos and 3D site scans of work completed, giving you full transparency over where your money goes and ensuring no one is ever overpaid.

Walk through a W. scan

Below is an interactive 3D scan of a W. Project under construction. These scans are completed at key stages of the build and shared with everyone involved for transparency.

Walk through a W.Home

Asset management, DLP and warranty: the scan is a spatially accurate as-built where every asset is pinned to its real location, so warranties, serials, service history, pinned defects and supplier and installer details sit on the house rather than a spreadsheet.

Under Construction.

W.MARINE PARADE (Western Australia)

A four-level coastal residence on one of Western Australia's most prestigious streets, demonstrating W.'s systems and procurement strategy to deliver significant projects across various states at once.

W.MARINE PARADE residence W.MARINE PARADE construction progress, September 2026 update, photo 1 W.MARINE PARADE construction progress, September 2026 update, photo 2 W.MARINE PARADE construction progress, September 2026 update, photo 3 W.MARINE PARADE residence W.MARINE PARADE residence

W.HEDGES (Queensland)

A striking three-level structure with a double-storey basement on Mermaid Beach, with expansive off-form concrete walls and sleek metal façades.

W.HEDGES residence W.HEDGES residence W.HEDGES residence W.HEDGES residence W.HEDGES residence W.HEDGES residence W.HEDGES residence W.HEDGES piling rig and excavation works W.HEDGES boundary piling works W.HEDGES site team working with the piling rig W.HEDGES construction progress, September 2026 update, photo 1 W.HEDGES construction progress, September 2026 update, photo 2 W.HEDGES construction progress, September 2026 update, photo 3 W.HEDGES construction progress, September 2026 update, photo 4 W.HEDGES construction progress, September 2026 update, photo 5 W.HEDGES construction progress, September 2026 update, photo 6 W.HEDGES beachfront excavation W.HEDGES basement excavation W.HEDGES site progress

W.HAWKSVIEW (New South Wales)

A two-storey residence on a sloping site in rural New South Wales, defined by sweeping curved form, expansive glazing, deep vertical sunshades, and timber cladding.

W.HAWKSVIEW residence render W.HAWKSVIEW residence render W.HAWKSVIEW residence render W.HAWKSVIEW residence render W.HAWKSVIEW residence render W.HAWKSVIEW residence render

W.AQUA (Victoria)

A breath-taking three-level residence with basement, showcasing expansive off-form concrete walls, soaring five-metre sliding windows and three luxurious pools.

W.AQUA residence W.AQUA residence W.AQUA residence W.AQUA site team installing curved formwork W.AQUA off-form concrete wall finish W.AQUA curved off-form concrete wall W.AQUA roof framing and installation works W.AQUA upper-level structural steel and framing W.AQUA structural steel W.AQUA site progress W.AQUA construction progress, September 2026 update, photo 1 W.AQUA construction progress, September 2026 update, photo 2 W.AQUA construction progress, September 2026 update, photo 3 W.AQUA construction progress, September 2026 update, photo 4 W.AQUA site progress W.AQUA basement pour W.AQUA steel delivery W.AQUA crane lift W.AQUA off-form concrete walls

W.HAMBLETON (Victoria)

An exquisite restoration and contemporary evolution of a heritage residence: refined Victorian craftsmanship, sophisticated modern additions and a luxurious new basement level.

W.HAMBLETON residence W.HAMBLETON residence W.HAMBLETON residence W.HAMBLETON residence W.HAMBLETON residence W.HAMBLETON residence W.HAMBLETON: Heritage facade with scaffolding W.HAMBLETON: Heritage brickwork and structural works W.HAMBLETON construction progress, September 2026 update, photo 1 W.HAMBLETON construction progress, September 2026 update, photo 2 W.HAMBLETON construction progress, September 2026 update, photo 3 W.HAMBLETON construction progress, September 2026 update, photo 4 W.HAMBLETON construction progress, September 2026 update, photo 5 W.HAMBLETON construction progress, September 2026 update, photo 6 W.HAMBLETON construction progress, September 2026 update, photo 7 W.HAMBLETON basement excavation W.HAMBLETON basement structure W.HAMBLETON site progress

W.ESPLANADE (Victoria)

A distinctive new build on Brighton's Esplanade, defined by sweeping sculptural forms and bold, panoramic double-height glazing that commands the beachfront.

W.ESPLANADE residence W.ESPLANADE residence W.ESPLANADE residence W.ESPLANADE circular formwork W.ESPLANADE slab pour W.ESPLANADE structure W.ESPLANADE interior framing, ceiling insulation and services installation W.ESPLANADE interior timber framing and concrete ceiling W.ESPLANADE spiral staircase construction W.ESPLANADE interior blockwork, framing and services W.ESPLANADE external wall construction W.ESPLANADE wall reinforcement and formwork W.ESPLANADE curved external wall and scaffolding W.ESPLANADE construction progress, September 2026 update, photo 1 W.ESPLANADE construction progress, September 2026 update, photo 2 W.ESPLANADE construction progress, September 2026 update, photo 3 W.ESPLANADE construction progress, September 2026 update, photo 4 W.ESPLANADE construction progress, September 2026 update, photo 5 W.ESPLANADE construction progress, September 2026 update, photo 6 W.ESPLANADE construction progress, September 2026 update, photo 7 W.ESPLANADE site progress W.ESPLANADE slab pour W.ESPLANADE aerial

References.

South Yarra residence Andrew Piva | Architect Director, BE Architecture
0402 158 394
Mermaid Waters residence Ed Crowley | Client Project: Mermaid Waters
0401 830 667
South Yarra residence Alvin Sariaatmadja | Client Project: South Yarra
+62 812 1197 333

Business Details.

Leadership

Scott Wilcox
Scott Wilcox Chief Executive Officer

Scott founded W. with one focus: to be Australia's first national legacy private residential builder. Behind it sits 15 years experience in legacy home construction, building some of Australia's most ambitious homes.

  • Oversees pre-construction and the contract agreement
  • Oversees the entire project. Every seat below reports up to him
Lachlan Cooper
Lachlan Cooper Commercial Manager

Lachlan's portfolio over the past 15 years in the industry spans from $35 million Passivehaus to Australia 108, the country's tallest residential tower. At W. he oversees cost and contract across every project.

  • Contract administration and programme obligations
  • Budget, procurement and subcontracts
  • Forecasting and cash position
  • Insurance, variations and document control
Ross Moresi
Ross Moresi Construction Manager

Ross has delivered several W. projects across multiple states, overseeing some of the most sophisticated residential builds in the country to one quality standard with client experience to match.

  • Programme and site delivery
  • Quality standards and inspections
  • Safety and risk
  • Client experience
Matthew Secatore
Matthew Secatore Design Manager

Matthew has been a Design Manager on multiple projects in excess of $100M with 15 years in the industry, including architectural roles at Architectus and Taylor Pressly Architects.

Design

  • Design resolution
  • Shop drawings
  • W.Details
  • Requests for information

WA Project Team

A dedicated project team, provided from start to finish.

Sarah Austin
Sarah Austin Project Manager (Full Time)

Sarah joined W. three years ago after a decade at LBA. She has since managed W.South Yarra and W.Alpine through to completion, two of the most complicated projects in our portfolio.

Based in HQ, Sarah leads the client relationship and owns the head contract, project rhythm and the time component for the works.

  • Contract program
  • Head contract
  • Client communications
  • Meeting agenda
  • Project operating system
  • Client experience
Bailey Heslop
Bailey Heslop Construction Manager (Full Time)

Before moving to WA, Bailey built a portfolio across Queensland, including projects in Burleigh, Brisbane and Hedges Avenue that set suburb sales records.

Currently managing 254 Marine Parade, he will oversee both Marine Parade projects with two full-time site managers reporting directly to him.

  • WA construction oversight
  • Safety oversight
  • Programme and sequencing
  • Quality standards
  • Trade coordination
  • Site manager coordination
Nick Brown
Nick Brown Contract Administrator (Full Time)

Based in HQ, Nick owns the numbers, paperwork and commercial administration that keep the project controlled.

  • Project budget
  • Trade procurement
  • Subcontract management
  • Insurances
  • Variations
  • Document control
  • RFIs

Competitive advantage.

Case Study254 Marine Parade

Programme

Bailey Heslop

Bailey Heslop

Construction Manager

Bailey leads construction delivery in WA, overseeing site teams and ensuring trades are coordinated at every stage of the build. He draws on his construction experience to plan the sequence of works, anticipate challenges and maintain quality. Detailed programming and regular progress reviews turn that approach into clear actions on site, keeping the build moving to schedule.

Previous contractor

24 monthsCompleted to date

12 monthsProgrammed for completion

37%Completed
63%Remaining works

Procurement

Lachlan Cooper

Lachlan Cooper

Commercial Manager

Lachlan leads procurement across W., drawing on his market knowledge and commercial experience to shape the right procurement strategy for each project. Using Let It and our national network, he applies his understanding of supplier capability, pricing and procurement risk to secure competitive pricing and keep procurement ahead of the construction programme.

Same procurement total. Achieved in six weeks.

Across structure, services and relevant trade packages.

Previous contractor 24months
6weeks
20%

Lower Cost

Compared with the previous contractor’s suggested costs.

Trade Recommendation Samples

Experience

Sarah Austin

Sarah Austin

Project Manager

Sarah brings clear communication and a professional, personal approach to the build. Through W.App and regular project reporting, she keeps clients informed and involved, with transparency around progress, costs and decisions that builds confidence throughout the project.

  • A clear point of contact

    Our team keeps you informed, answers your questions and guides you through each stage of the build.

  • Visibility throughout

    Daily communications and weekly updates via W.App, real-time site cameras and regular 3D scans keep you connected to the build, with visibility of work completed.

  • Confidence in decisions

    Clear and transparent trade recommendations help you make informed decisions.

“Working with W. has changed our lives.”
Marine Parade Owners

Local · National · International

Procurement & Delivery

We operate at three layers:

  1. People & processes

    Local trades

    As a first step, we can optimise local trades to perform above standard on time, cost and quality through our people and processes.

  2. Network & buying power

    Across Australia

    Second, we can bring in high-quality suppliers and contractors from across Australia where appropriate, using our extended network and buying power.

  3. Further cost reduction

    International

    Third, we can leverage international supply chains where required to reduce costs further.

Layer 01 · Local · Mermaid

Local trades. Direct packages.

25%Approx. structure package saving

At Mermaid, we split the concrete structure package into individual packages for reinforcement, concrete supply, formwork and concrete placement each of which are directly coordinated by us using local suppliers and trades to optimise the quality and program while also saving approximately 25% in total compared to engaging a contractor as one bundled package.

Mermaid · concrete structure

Four direct packages, coordinated by W.

  • Reinforcement supply
  • Concrete supply
  • Formwork
  • Concrete placement
Mermaid street facade with curved canopy Mermaid waterfront elevation and pool terrace Mermaid covered rooftop terrace Mermaid curved staircase and stairwell form Mermaid aerial view of roof slabs, terraces and pool

Layer 02 · National · Anderson

National procurement of external materials

70%Approx. brick package saving

At Anderson the specified brick was $10 a brick. We sourced the same brick for $3 and adjusted the laying technique, taking roughly 70% out of the package with the architecture untouched.

Anderson · brick package

Specified brick · per brick
$10
Same brick, sourced nationally · per brick
$3
Anderson brick facade and curved brick column Anderson brick and concrete detail Anderson timber kitchen Anderson stone vanity

Layer 03 · International · Canterbury

International direct factory sourcing of internal materials

30%Approx. joinery package saving

Canterbury was procured directly from the factories, internationally, against a conventional locally sourced specification. The marble below—slabs, benchtops, fireplaces, vanities—was sourced direct. The finished home set the Middle Park record for an attached terrace.

Canterbury · interiors & externals

Conventional, locally sourced, as specified
$2.2M
Delivered · design & construct, sourced direct
$1.5M
Result
Suburb record
Canterbury curved marble benchtop detail Canterbury kitchen with marble island and splashback Canterbury marble fireplace and timber joinery Canterbury kitchen and living area with marble finishes

One Promise. True Alignment.

Our interests and our client's interests are aligned across every dimension of the project.

Together We Reclaim Time.

Every build is programmed to the day against a live schedule our clients can see. Our fee is fixed. We have no incentive to extend and every reason to deliver early.

Together We Protect Cost.

Every cost is competitively tendered, benchmarked against market, and filtered through a trained financial model fine-tuned on a decade of commercial data. Our fee is fixed against a defined scope. Every dollar saved on trades protects the client's cost and our margin.

Together We Perfect Quality.

Defect-free at handover. No leaks. No unfinished work. Every stage inspected and documented against a quality system defined by national exposure and strengthened by the most cutting edge construction technology stack available. Our reputation is our pipeline.

Together We Elevate the Experience.

Live site cameras streaming to your device, a private daily feed of progress and milestones, one dedicated app for all communication, documents, data, and your W. team. A build with no blind spots is a build with fewer queries to answer. Transparency serves both sides.

Four Guarantees. One Promise. True Alignment.
The W. team The W. team The W. team Lachlan Cooper Sarah Austin Bailey Heslop The W. team The W. team

Let's discuss the next steps

Scotty
Builder
W.ROBERTS
Australia's legacy private residential builder